
This is a Sino NEXCO interchange Suwa Chuo line up from August 09 through 11 (IC) to implement the regulations on egress traffic stop. Closure, the bridge exit ramp of the same interface (the amount today) because the pain was intense at the pavement surface. 9 from 10 am to 6:00 am, November 08.Suwa, Nagano IC closed to traffic between Exit 09 from November 08
No comments:
Post a Comment